CAPP ( COMPUTER AIDED DESIGN AND MANUFACTURIN )
INTRODUCTION
Process planning translates design information into the process steps and instructions to efficiently and effectively
manufacture products. As the design process is supported by many computer-aided tools, computer-aided process planning (CAPP)
has evolved to simplify and improve process planning and achieve more effective use of manufacturing resources.
PROCESS PLANNING
Process planning encompasses the activities and functions to prepare a detailed set of plans and instructions
to produce a part. The planning begins with engineering drawings, specifications, parts or material lists and a forecast of
demand. The results of the planning are:
- Routings which specify operations, operation sequences, work centers, standards, tooling and fixtures.This routing becomes
a major input to the manufacturing resource planning system to define operations for production activity control purposes
and define required resources for capacity requirements planning purposes.
- Process plans which typically provide more detailed,step-by-step work instructions including dimensions related to individual
operations, machining parameters, set-up instructions, and quality assurance checkpoints.
- Fabrication and assembly drawings to support manufacture (as opposed to engineering drawings to define the part).
Manual process planning is based on a manufacturing engineer's experience and knowledge of production facilities,equipment,
their capabilities, processes, and tooling. Process planning is very time-consuming and the results vary based on the person
doing the planning.
COMPUTER-AIDED PROCESS PLANNING
Manufacturers have been pursuing an evolutionary path to improve and computerize process planning in the following five
stages:
Prior to CAPP, manufacturers attempted to overcome the problems of manual process planning by basic classification of parts
into families and developing somewhat standardized process plans for parts families (Stage I). When a new part was introduced,
the process plan for that family would be manually retrieved, marked-up and retyped. While this improved productivity, it
did not improve the quality of the planning of processes and it did not easily take into account the differences between parts
in a family nor improvements in production processes.
Computer-aided process planning initially evolved as a means
to electronically store a process plan once it was created, retrieve it, modify it for a new part and print the plan (Stage
II). Other capabilities of this stage are table-driven cost and standard estimating systems.
This initial computer-aided
approach evolved into what is now known as "variant" CAPP. However, variant CAPP is based on a Group Technology (GT) coding
and classification approach to identify a larger number of part attributes or parameters. These attributes allow the system
to select a baseline process plan for the part family and accomplish about ninety percent of the planning work. The planner
will add the remaining ten percent of the effort modifying or fine-tuning the process plan. The baseline process plans stored
in the computer are manually entered using a super planner concept,that is, developing standardized plans based on the accumulated
experience and knowledge of multiple planners and manufacturing engineers (Stage III).
The next stage of evolution
is toward generative CAPP (Stage IV). At this stage, process planning decision rules are built into the system. These decision
rules will operate based on a part's group technology or features technology coding to produce a process plan that will require
minimal manual interaction and modification (e.g., entry of dimensions).
While CAPP systems are moving more and more
towards being generative, a pure generative system that can produce a complete process plan from part classification and other
design data is a goal of the future. This type of purely generative system (in Stage V) will involve the use of artificial
intelligence type capabilities to produce process plans as well as be fully integrated in a CIM environment. A further step
in this stage is dynamic, generative CAPP which would consider plant and machine capacities, tooling availability, work center
and equipment loads, and equipment status (e.g., maintenance downtime) in developing process plans.
The process plan
developed with a CAPP system at Stage V would vary over time depending on the resources and workload in the factory. For example,
if a primary work center for an operation(s) was overloaded, the generative planning process would evaluate work to be released
involving that work center,alternate processes and the related routings. The decision rules would result in process plans
that would reduce the overloading on the primary work center by using an alternate routing that would have the least cost
impact. Since finite scheduling systems are still in their infancy, this additional dimension to production scheduling is
still a long way off.
Dynamic, generative CAPP also implies the need for online display of the process plan on a workorder
oriented basis to insure that the appropriate process plan was provided to the floor. Tight integration with a manufacturing
resource planning system is needed to track shop floor status and load data and assess alternate routings vis-a-vis the schedule.Finally,
this stage of CAPP would directly feed shop floor equipment controllers or, in a less automated environment,display assembly
drawings online in conjunction with process plans.
CAPP PLANNING PROCESS
The system logic involved in establishing a variant process planning system is relatively straight forward - it is one
of matching a code with a pre-established process plan maintained in the system. The initial challenge is in developing the
GT classification and coding structure for the part families and in manually developing a standard baseline process plan for
each part family.
The first key to implementing a generative system is the development of decision rules appropriate
for the items to be processed. These decision rules are specified using decision trees, computer languages involving logical
"if-then" type statements, or artificial intelligence approaches with object-oriented programming.
The nature of the
parts will affect the complexity of the decision rules for generative planning and ultimately the degree of success in implementing
the generative CAPP system.The majority of generative CAPP systems implemented to date have focused on process planning for
fabrication of sheet metal parts and less complex machined parts. In addition, there has been significant recent effort with
generative process planning for assembly operations, including PCB assembly.
A second key to generative process planning
is the available data related to the part to drive the planning. Simple forms of generative planning systems may be driven
by GT codes. Group technology or features technology (FT) type classification without a numeric code may be used to drive
CAPP. This approach would involve a user responding to a series of questions about a part that in essence capture the same
information as in a GT or FT code. Eventually when features-oriented data is captured in a CAD system during the design process,
this data can directly drive CAPP.
CAD/CAM INTEGRATION AND CAPP FEATURES
A frequently overlooked step in the integration of CAD/CAM is the process planning that must occur. CAD systems generate
graphically oriented data and may go so far as graphically identifying metal, etc. to be removed during processing. In order
to produce such things as NC instructions for CAM equipment, basic decisions regarding equipment to be used,tooling and operation
sequence need to be made. This is the function of CAPP. Without some element of CAPP, there would not be such a thing as CAD/CAM
integration. Thus CAD/CAM systems that generate tool paths and NC programs include limited CAPP capabilities or imply a certain
approach to processing.
CAD systems also provide graphically-oriented data to CAPP systems to use to produce assembly
drawings, etc. Further,this graphically-oriented data can then be provided to manufacturing in the form of hardcopy drawings
or work instruction displays. This type of system uses work instruction displays at factory workstations to display process
plans graphically and guide employees through assembly step by step. The assembly is shown on the screen and as a employee
steps through the assembly process with a footswitch, the components to be inserted or assembled are shown on the CRT graphically
along with text instructions and warnings for each step.
If NC machining processes are involved, CAPP software exists
which will select tools, feeds, and speeds, and prepare NC programs.
CAPP BENEFITS
Significant benefits can result from the implementation of CAPP. In a detailed survey of twenty-two large and small companies
using generative-type CAPP systems, the following estimated cost savings were achieved:
- 58% reduction in process planning effort
- 10% saving in direct labor
- 4% saving in material
- 10% saving in scrap
- 12% saving in tooling
- 6% reduction in work-in-process
In addition, there are intangible benefits as follows:
- Reduced process planning and production leadtime; faster response to engineering changes
- Greater process plan consistency; access to up-to-date information in a central database
- Improved cost estimating procedures and fewer calculation errors
- More complete and detailed process plans
- Improved production scheduling and capacity utilization
- Improved ability to introduce new manufacturing technology and rapidly update process plans to utilize the improved technology
SUMMARY
CAPP is a highly effective technology for discrete manufacturers with a significant number of products and process steps.
Rapid strides are being made to develop generative planning capabilities and incorporate CAPP into a computer-integrated manufacturing
architecture. The first step is the implementation of GT or FT classification and coding. Commercially-available software
tools currently exist to support both GT and CAPP. As a result, many companies can achieve the benefits of GT and CAPP with
minimal cost and risk. Effective use of these tools can improve a manufacturer's competitive advantage.CAD/CAM CENTER.
|